Our Projects
Prittlewell Chapel
Working with a local lighting manufacturer MDE Power carried out replacement of existing illuminated bollards with new vandal resistant street columns for Southend City Council, the street columns were installed around the chapel and also along the car park and path of North Road Cemetery.
Lime Walk (Warrior Square)
The existing column hung lanterns within Lime walk had reached end of life. MDE Power supplied and installed new energy efficient LED retrofit solution to ensure the architectural lanterns can shine for many years to come.
Southend Travel Centre
Completed in 2003, the existing recessed fluorescent lighting within Southend Travel centre was failing and required a cost effective solution for the replacement and also for energy saving. MDE Power designed and installed a full LED retrofit of the recessed lights and also the uplighters in the high level ceiling.
Cliffs Pavilion
MDE Power supplied and installed a full panel board replacement complete with UKPN liaison and scheduled shutdowns of the main intake supply to enable the replacement of the original 1960’s panel board, although full refurbishment of the property was carried out in the 90’s the existing panel board was retained and extended. During the 2020 Covid pandemic we took on the project to remove the old panel and relocate all services to a bespoke panel board that was delivered and assembled on site.